Pacific Dawn Cruise Ship
SYNOPSIS
The vessel’s owners required a specialist flooring contractor to install and convert a swimming pool into a children’s wet soft play area, Thortech Bridges and Marine Ltd were appointed to carry out the work.
The project was carried out and completed in March 2017.
BRIEF
In order to accommodate the many younger passengers travelling on the cruise ship a wet soft-play area was commissioned to be installed instead of an existing swimming pool.
PROCESS
With air temperature averaging 38 degrees & deck temperature between 30 and 60 degrees depending on the time of the day, the life of the product was between 15-25 minutes before curing completely, so efficiency was paramount in the application. After curing excess crumb was swept off and the final water features were installed in place.
OUTCOME
Thortech completed the installation of the new soft wet play surfacing in March 2017; despite the delays in the accessibility, a finalised design was constructed to coincide with the restricted working hours. The project was completed on schedule and is a huge success, currently providing the platform for entertainment for the many passengers of the Pacific Dawn.